Risk assessment of implementation activities for the construction of water pumping station power supply equipment using the FMEA method.

Document Type : Original Article

Authors

1 Ray Ab consulting engineers

2 Faculty of Engineering and Technology, Islamic Azad University, Unit S, Julfa city, Marand city, East Azerbaijan province, Iran.

3 Faculty member, Faculty of Engineering, Islamic Azad University, Aras Branch

Abstract

The results show that the risk of electrocution, working at height, falling of people and objects, collision with machinery and equipment, explosion and fire with risk numbers in the range of 251 and 350, and electrocution of faulty equipment, moving heavy objects, wire rope rupture and heat stroke with risk numbers in the range of 151 and 250 are the most catastrophic and dangerous. Finally, the risk of fatigue caused by work and improper ergonomics for the activity of preparing as-built and construction drawings is evaluated and introduced as the least dangerous with risk numbers in the range of 4 to 8. The results of this study can be used to prevent accidents in power transmission line projects in the electricity supply industry, water and wastewater industry and oil and gas industries. most important risks prevents time wastage and reduces project-related costs, and increases the effectiveness of activity control measures.

Keywords


  • Received Date: 28 September 2025
  • Received Date: 09 November 2025
  • Accepted Date: 07 February 2026
  • Published Date: 21 January 2026